Döring, Björn and Zink, Manfred and Schwerdt, Marco (2013) GMES Sentinel-1 Calibration and Performance Budget. Project Report. S1-TN-DLR-SY-0003, Issue 1.5. 17 S.
![]() |
PDF
- Only accessible within DLR
435kB |
Abstract
This document aims to derive the absolute radiometric accuracy for the Sentinel 1 SAR satellite. It integrates results found by EADS Astrium regarding the SAR instrument and processing, and derives additional uncertainty contributions with respect to the external calibration and the atmosphere.
Item URL in elib: | https://elib.dlr.de/86645/ | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Document Type: | Monograph (Project Report) | ||||||||||||||||
Title: | GMES Sentinel-1 Calibration and Performance Budget | ||||||||||||||||
Authors: |
| ||||||||||||||||
Date: | 23 August 2013 | ||||||||||||||||
Refereed publication: | No | ||||||||||||||||
Open Access: | No | ||||||||||||||||
Gold Open Access: | No | ||||||||||||||||
In SCOPUS: | No | ||||||||||||||||
In ISI Web of Science: | No | ||||||||||||||||
Number of Pages: | 17 | ||||||||||||||||
Series Name: | Technical Note | ||||||||||||||||
Status: | Published | ||||||||||||||||
Keywords: | radiometric calibration, SAR system, Sentinel-1 | ||||||||||||||||
HGF - Research field: | Aeronautics, Space and Transport | ||||||||||||||||
HGF - Program: | Space | ||||||||||||||||
HGF - Program Themes: | Earth Observation | ||||||||||||||||
DLR - Research area: | Raumfahrt | ||||||||||||||||
DLR - Program: | R EO - Earth Observation | ||||||||||||||||
DLR - Research theme (Project): | R - Projekt TanDEM-X (old) | ||||||||||||||||
Location: | Oberpfaffenhofen | ||||||||||||||||
Institutes and Institutions: | Microwaves and Radar Institute Microwaves and Radar Institute > Spaceborne SAR Systems | ||||||||||||||||
Deposited By: | Döring, Björn | ||||||||||||||||
Deposited On: | 12 Dec 2013 09:43 | ||||||||||||||||
Last Modified: | 10 Jan 2014 22:14 |
Repository Staff Only: item control page