Salussolia, Massimo and Gargioli, Eugenio and Burzagli, Fabio and Porth, Norbert and Rehman-Saad, Misbahur (2011) 3-YEAR OF INDUSTRIAL TO THE ISS OPERATIONS OF THE ESA ELEMENTS. 62nd International Astronautical Congress , 03.-07.10.2011, Kapstadt, Südafrika.

[img] PDF
26kB

Abstract

Europe has now entered the full exploitation phase of its contribution to the International Space Sta- tion. The implementation of the operations tasks for the ISS Operations Program has been delegated by ESA to the Integrated Operations Team (IOT) which, through a single End-to-End Contract, provides the services necessary to maintain, support and operate the European Elements of the ISS. A continuous process has been put in place for the collection of lessons-learnt, the de nition of the necessary recovery actions and the control of their implementation, in close-cooperation among the various parties, ESA, COL-CC, USOCs and the Industrial consortium. After this initial three years cycle, the lessons-learnt assessment has enabled to highlight the change of attitude embedded in transitioning from Design and Development to the actual real Operations on-orbit: this leap is particularly evident in the shorter re- action times, in the exibility obtained by re-interpreting system performances beyond the design and quali cation boundaries to meet extra-operational needs andso forth. The paper brie y describes the IOT organization and relationships with ESA, recalls the TAS-I role in general and in particular for Columbus operations, gives some hints on the established Lessons Learnt Process, analyzes the challenges for engineering and operations integration to keep up with on-board activity ow, focusing in detail on some notable cases as examples of anomaly management. Moreover, some speci c cases will be addressed as peculiar examples of the change of pace imposed by the on-orbit operations: the WOOV8 blockage (Columbus TCS internal issue), DMS vital layer failure (Columbus system-wide issue), ETCS loop A Pump stop (station-wide issue). 1

Item URL in elib:https://elib.dlr.de/74700/
Document Type:Conference or Workshop Item (Speech, Paper)
Title:3-YEAR OF INDUSTRIAL TO THE ISS OPERATIONS OF THE ESA ELEMENTS
Authors:
AuthorsInstitution or Email of AuthorsAuthors ORCID iD
Salussolia, MassimoThales Alenia Space ItaliaUNSPECIFIED
Gargioli, EugenioThales Alenia Space ItaliaUNSPECIFIED
Burzagli, FabioThales Alenia Space ItaliaUNSPECIFIED
Porth, NorbertDLR, GSOCUNSPECIFIED
Rehman-Saad, MisbahurInsyen AGUNSPECIFIED
Date:2011
Open Access:Yes
Gold Open Access:No
In SCOPUS:No
In ISI Web of Science:No
Status:Published
Keywords:COL-CC, USOC, ISS, TAS-I, ESA
Event Title:62nd International Astronautical Congress
Event Location:Kapstadt, Südafrika
Event Type:international Conference
Event Dates:03.-07.10.2011
Organizer:International Astronautical Federation
HGF - Research field:Aeronautics, Space and Transport (old)
HGF - Program:Space (old)
HGF - Program Themes:W - no assignment
DLR - Research area:Space
DLR - Program:W - no assignment
DLR - Research theme (Project):W - no assignment (old)
Location: Oberpfaffenhofen
Institutes and Institutions:Space Operations and Astronaut Training > GSOC-German Space Operations Center
Space Operations and Astronaut Training
Deposited By: Klaas, Sabine
Deposited On:30 Jan 2012 09:58
Last Modified:31 Jul 2019 19:35

Repository Staff Only: item control page

Browse
Search
Help & Contact
Information
electronic library is running on EPrints 3.3.12
Copyright © 2008-2017 German Aerospace Center (DLR). All rights reserved.