Feldhoff, Jan Fabian and Eickhoff, Martin and Hirsch, Tobias and Keller, Lothar and Meyer-Grünefeldt, Mirko and Pernpeintner, Johannes and Leon Alonso, Javier and Valenzuela, Loreto (2013) Status and first results of the DUKE project Qualification of new DSG receivers and collectors. SolarPACES 2013 conference, 2013-09-17 - 2013-09-20, Las Vegas, USA.
Full text not available from this repository.
Abstract
One option to improve the cost-effectiveness and environmental friendliness of parabolic trough power plants is the utilization of water/steam in the solar field, the so-called direct steam generation (DSG). First commercial stand-alone plants using DSG are now in operation in Thailand (parabolic trough with superheating by Solarlite) and in Spain (linear Fresnel for saturated steam by Novatec Solar). To further bring down the costs of a DSG solar field, the research project DUKE aims at the development and demonstration of a commercially applicable once-through mode design. The demonstration will be done at the DISS test facility at the Plataforma Solar de Almería (PSA), Spain, by the DLR-Institute of Solar Research in close collaboration with the Spanish CIEMAT. For this purpose, the DISS test facility was upgraded to a length of 1000 m by three new collectors. It now has commercial-scale size and, in addition, is able to stand 500 °C and 110 bar at the outlet [1]. The construction and commissioning of the new plant has been completed (see Fig. 1) and the first test period has started in May 2013. The paper examines two aspects: illustrate the design changes of the solar field and show the performance of the two new main components: the DSG receivers as well as the new collectors.
Item URL in elib: | https://elib.dlr.de/85477/ | ||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Document Type: | Conference or Workshop Item (Poster) | ||||||||||||||||||||||||||||||||||||
Title: | Status and first results of the DUKE project Qualification of new DSG receivers and collectors | ||||||||||||||||||||||||||||||||||||
Authors: |
| ||||||||||||||||||||||||||||||||||||
Date: | September 2013 | ||||||||||||||||||||||||||||||||||||
Refereed publication: | Yes | ||||||||||||||||||||||||||||||||||||
Open Access: | No | ||||||||||||||||||||||||||||||||||||
Gold Open Access: | No | ||||||||||||||||||||||||||||||||||||
In SCOPUS: | No | ||||||||||||||||||||||||||||||||||||
In ISI Web of Science: | No | ||||||||||||||||||||||||||||||||||||
Status: | Published | ||||||||||||||||||||||||||||||||||||
Keywords: | Direktverdampfung DUKE Durchlaufkonzept Solarlite Solar Betriebsstrategie | ||||||||||||||||||||||||||||||||||||
Event Title: | SolarPACES 2013 conference | ||||||||||||||||||||||||||||||||||||
Event Location: | Las Vegas, USA | ||||||||||||||||||||||||||||||||||||
Event Type: | international Conference | ||||||||||||||||||||||||||||||||||||
Event Start Date: | 17 September 2013 | ||||||||||||||||||||||||||||||||||||
Event End Date: | 20 September 2013 | ||||||||||||||||||||||||||||||||||||
HGF - Research field: | Energy | ||||||||||||||||||||||||||||||||||||
HGF - Program: | Renewable Energies | ||||||||||||||||||||||||||||||||||||
HGF - Program Themes: | Concentrating Solar Systems (old) | ||||||||||||||||||||||||||||||||||||
DLR - Research area: | Energy | ||||||||||||||||||||||||||||||||||||
DLR - Program: | E SF - Solar research | ||||||||||||||||||||||||||||||||||||
DLR - Research theme (Project): | E - Linienfokussierende Systeme (old) | ||||||||||||||||||||||||||||||||||||
Location: | Köln-Porz , Stuttgart | ||||||||||||||||||||||||||||||||||||
Institutes and Institutions: | Institute of Solar Research > Qualifizierung Institute of Solar Research > Linienfokussierende Systeme | ||||||||||||||||||||||||||||||||||||
Deposited By: | Hirsch, Dr.-Ing. Tobias | ||||||||||||||||||||||||||||||||||||
Deposited On: | 29 Nov 2013 14:34 | ||||||||||||||||||||||||||||||||||||
Last Modified: | 24 Apr 2024 19:51 |
Repository Staff Only: item control page