elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Imprint | Privacy Policy | Contact | Deutsch
Fontsize: [-] Text [+]

Col-CC Voice System Migration During On-Going Operations

Müller, Thomas (2012) Col-CC Voice System Migration During On-Going Operations. SpaceOps2012, 11.-15.6.2012, Stockholm, Schweden.

[img] PDF
364kB
[img] MS PowerPoint
700kB

Official URL: http://www.spaceops2012.org/proceedings/proceedings.html

Abstract

Verbal coordination via voice loops is still an essential part of space operations. This is especially true for human space flight and even more for the highly distributed operations for the International Space Station (ISS). Coordination between on-board and ground and between all operations centres relays to a major extend on voice loops. Consequently the voice conferencing system is one of the most critical systems in a mission control centre. The Voice System (VoCS) of the Columbus Control Center (Col-CC) supports not only the Columbus operations done from Col-CC, but all European User Centres including the ATV Control Centre and supporting sites are connected via the Col-CC voice system to the International Partner systems/sites. This paper describes the complex migration to a new voice system at the Columbus Control-Centre (Col-CC) in 2011. This had to happen during the on-going ISS operations with minimal service impact. After a short overview of the general set-up of voice communications within the European ground segment and a summary of the reasons for exchanging the system after just about 6 years in operations is given. The different possible migration scenarios with their technical and perational impacts are discussed with the conclusion and explanation on the step-by-step approach chosen for this migration. Problems during the migration, dependencies to systems of other control centres as well as operational dependencies and planning issues are described. The step-by-step migration implied also a staggered testing and operational validation sequence. The testing had to be carefully planned and integrated in the migration steps. Operational validation had to be done during operations with roll-back possibilities rather then a final validation before a hand over to operations.

Item URL in elib:https://elib.dlr.de/76705/
Document Type:Conference or Workshop Item (Speech, Paper)
Title:Col-CC Voice System Migration During On-Going Operations
Authors:
AuthorsInstitution or Email of AuthorsAuthors ORCID iD
Müller, Thomasth.mueller (at) dlr.deUNSPECIFIED
Date:11 June 2012
Open Access:Yes
Gold Open Access:No
In SCOPUS:No
In ISI Web of Science:No
Status:Published
Keywords:DLR, GSOC, COL-CC, ISS, operation, voice, voice conferencing, ATV, communication, migration, test, validation, roll-back
Event Title:SpaceOps2012
Event Location:Stockholm, Schweden
Event Type:international Conference
Event Dates:11.-15.6.2012
Organizer:SpaceOps
HGF - Research field:Aeronautics, Space and Transport (old)
HGF - Program:Space (old)
HGF - Program Themes:W SY - Technik für Raumfahrtsysteme
DLR - Research area:Space
DLR - Program:W SY - Technik für Raumfahrtsysteme
DLR - Research theme (Project):W - Vorhaben Infrastruktur und Unterstützung für Raumflugbetrieb (old)
Location: Oberpfaffenhofen
Institutes and Institutions:Space Operations and Astronaut Training > GSOC-German Space Operations Center
Deposited By: Pilgram, Martin
Deposited On:10 Aug 2012 11:38
Last Modified:31 Jul 2019 19:37

Repository Staff Only: item control page

Browse
Search
Help & Contact
Information
electronic library is running on EPrints 3.3.12
Copyright © 2008-2017 German Aerospace Center (DLR). All rights reserved.