Daga, Tanmay and Meissner, Robert and Pohya, Ahmad Ali and Wende, Gerko (2026) Analyzing the Effect of Prognosis on Spare Part Inventory Management. 3rd International Conference for CBM in Aerospace, 2026-05-19 - 2026-05-21, Athens, Greece.
|
PDF
1MB |
Abstract
For an effective inventory management, the accurate prediction of demand is critical. While advanced prognostic algorithms theoretically exist in aviation, their adoption has been limited thus far, partially due to high development costs, extensive data requirements, computational complexities and their impact assessment. This study, addresses the question of whether a benchmarking method can be defined, to determine if the prognostic failure predictions provide measurable advantages over statistics-based approaches for spare part inventory management. A metric-driven surrogate framework is proposed that emulates prognostic models using two key performance/maturity indicators: prediction accuracy (α) and prognostic horizon (PH). Implemented within a discrete-event simulation (DES) environment, the framework evaluates how variations in these metrics affect total inventory cost and logistics service level (i.e., the share of fulfilled material requests without delays). The results provide practitioners with breakeven points between predictive and traditional reliability-based approaches. They further highlight which aspects of prediction capability have the highest influence on operational benefits, enabling targeted improvements in predictive performance
| Item URL in elib: | https://elib.dlr.de/224588/ | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document Type: | Conference or Workshop Item (Speech) | ||||||||||||||||||||
| Title: | Analyzing the Effect of Prognosis on Spare Part Inventory Management | ||||||||||||||||||||
| Authors: |
| ||||||||||||||||||||
| Date: | 20 May 2026 | ||||||||||||||||||||
| Refereed publication: | No | ||||||||||||||||||||
| Open Access: | Yes | ||||||||||||||||||||
| Gold Open Access: | No | ||||||||||||||||||||
| In SCOPUS: | No | ||||||||||||||||||||
| In ISI Web of Science: | No | ||||||||||||||||||||
| Status: | Published | ||||||||||||||||||||
| Keywords: | Prognostics, Spare Part Management, Inventory, Logistics, Reliability. | ||||||||||||||||||||
| Event Title: | 3rd International Conference for CBM in Aerospace | ||||||||||||||||||||
| Event Location: | Athens, Greece | ||||||||||||||||||||
| Event Type: | international Conference | ||||||||||||||||||||
| Event Start Date: | 19 May 2026 | ||||||||||||||||||||
| Event End Date: | 21 May 2026 | ||||||||||||||||||||
| Organizer: | CBM Academy | ||||||||||||||||||||
| HGF - Research field: | Aeronautics, Space and Transport | ||||||||||||||||||||
| HGF - Program: | Aeronautics | ||||||||||||||||||||
| HGF - Program Themes: | Components and Systems | ||||||||||||||||||||
| DLR - Research area: | Aeronautics | ||||||||||||||||||||
| DLR - Program: | L CS - Components and Systems | ||||||||||||||||||||
| DLR - Research theme (Project): | L - MRO and Cabin | ||||||||||||||||||||
| Location: | Hamburg | ||||||||||||||||||||
| Institutes and Institutions: | Institute of Maintenance, Repair and Overhaul > Product Life Cycle Management | ||||||||||||||||||||
| Deposited By: | Daga, Tanmay | ||||||||||||||||||||
| Deposited On: | 02 Jun 2026 11:16 | ||||||||||||||||||||
| Last Modified: | 10 Jul 2026 09:16 |
Repository Staff Only: item control page