elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Imprint | Privacy Policy | Accessibility | Contact | Deutsch
Fontsize: [-] Text [+]

Analysis of cost‑efficient launcher family composition under consideration of uncertain launch market scenarios

Wilken, Jascha (2025) Analysis of cost‑efficient launcher family composition under consideration of uncertain launch market scenarios. CEAS Space Journal. Springer. doi: 10.1007/s12567-025-00643-6. ISSN 1868-2502.

[img] PDF - Published version
6MB

Official URL: https://link.springer.com/article/10.1007/s12567-025-00643-6

Abstract

A modular family of launch vehicles based on the Prometheus engine, currently in development, is among the concepts being explored for future European launch systems. This modular approach enables the sharing of major components across different configurations, potentially reducing development costs and lowering recurring launch expenses through increased production efficiency. However, the optimal composition and sizing of such modular launch families remain insufficiently addressed in existing literature. This study provides an initial investigation into the recurring and non-recurring costs associated with two modular launch vehicle families employing reusable Vertical Takeoff and Vertical Landing first stages. It examines how the number and selection of family members influence overall costs and evaluates the sensitivity of these outcomes to uncertainties in the future launch market. The analysis reveals that the largest family is not the most cost-effective composition for partially reusable launch vehicle systems. Thanks to the recurring cost reduction enabled by reusing the first stage, the additional cost of developing the entire family is not amortized across a broad spectrum of future possible launch markets. Instead, a streamlined family consisting of two members with significant component overlap minimizes total costs. In contrast, for a launch vehicle family utilizing expendable first stages, the larger family compositions amortize the additional development costs, resulting in lower total costs compared to family compositions with fewer members. As an additional observation, the cost-optimal family composition with reusable first stages costs approximately one-third less than its expendable counterpart.

Item URL in elib:https://elib.dlr.de/215394/
Document Type:Article
Title:Analysis of cost‑efficient launcher family composition under consideration of uncertain launch market scenarios
Authors:
AuthorsInstitution or Email of AuthorsAuthor's ORCID iDORCID Put Code
Wilken, JaschaJascha.Wilken (at) dlr.dehttps://orcid.org/0000-0001-5748-1261188806632
Date:21 July 2025
Journal or Publication Title:CEAS Space Journal
Refereed publication:Yes
Open Access:Yes
Gold Open Access:No
In SCOPUS:Yes
In ISI Web of Science:Yes
DOI:10.1007/s12567-025-00643-6
Publisher:Springer
ISSN:1868-2502
Status:Published
Keywords:Launch vehicle family, Cost estimation, Reusability trade-off, Modular, Monte Carlo simulation
HGF - Research field:Aeronautics, Space and Transport
HGF - Program:Space
HGF - Program Themes:Space Transportation
DLR - Research area:Raumfahrt
DLR - Program:R RP - Space Transportation
DLR - Research theme (Project):R - System Analysis Space Transport (SART) [RP], D - ProTeKT
Location: Bremen
Institutes and Institutions:Institute of Space Systems > Space Launcher Systems Analysis
Deposited By: Wilken, Jascha
Deposited On:29 Jul 2025 10:25
Last Modified:29 Jul 2025 10:25

Repository Staff Only: item control page

Browse
Search
Help & Contact
Information
OpenAIRE Validator logo electronic library is running on EPrints
Website and database design: Copyright © German Aerospace Center (DLR). All rights reserved.