elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Impressum | Datenschutz | Barrierefreiheit | Kontakt | English
Schriftgröße: [-] Text [+]

Analysis of cost‑efficient launcher family composition under consideration of uncertain launch market scenarios

Wilken, Jascha (2025) Analysis of cost‑efficient launcher family composition under consideration of uncertain launch market scenarios. CEAS Space Journal. Springer. doi: 10.1007/s12567-025-00643-6. ISSN 1868-2502.

[img] PDF - Verlagsversion (veröffentlichte Fassung)
6MB

Offizielle URL: https://link.springer.com/article/10.1007/s12567-025-00643-6

Kurzfassung

A modular family of launch vehicles based on the Prometheus engine, currently in development, is among the concepts being explored for future European launch systems. This modular approach enables the sharing of major components across different configurations, potentially reducing development costs and lowering recurring launch expenses through increased production efficiency. However, the optimal composition and sizing of such modular launch families remain insufficiently addressed in existing literature. This study provides an initial investigation into the recurring and non-recurring costs associated with two modular launch vehicle families employing reusable Vertical Takeoff and Vertical Landing first stages. It examines how the number and selection of family members influence overall costs and evaluates the sensitivity of these outcomes to uncertainties in the future launch market. The analysis reveals that the largest family is not the most cost-effective composition for partially reusable launch vehicle systems. Thanks to the recurring cost reduction enabled by reusing the first stage, the additional cost of developing the entire family is not amortized across a broad spectrum of future possible launch markets. Instead, a streamlined family consisting of two members with significant component overlap minimizes total costs. In contrast, for a launch vehicle family utilizing expendable first stages, the larger family compositions amortize the additional development costs, resulting in lower total costs compared to family compositions with fewer members. As an additional observation, the cost-optimal family composition with reusable first stages costs approximately one-third less than its expendable counterpart.

elib-URL des Eintrags:https://elib.dlr.de/215394/
Dokumentart:Zeitschriftenbeitrag
Titel:Analysis of cost‑efficient launcher family composition under consideration of uncertain launch market scenarios
Autoren:
AutorenInstitution oder E-Mail-AdresseAutoren-ORCID-iDORCID Put Code
Wilken, JaschaJascha.Wilken (at) dlr.dehttps://orcid.org/0000-0001-5748-1261188806632
Datum:21 Juli 2025
Erschienen in:CEAS Space Journal
Referierte Publikation:Ja
Open Access:Ja
Gold Open Access:Nein
In SCOPUS:Ja
In ISI Web of Science:Ja
DOI:10.1007/s12567-025-00643-6
Verlag:Springer
ISSN:1868-2502
Status:veröffentlicht
Stichwörter:Launch vehicle family, Cost estimation, Reusability trade-off, Modular, Monte Carlo simulation
HGF - Forschungsbereich:Luftfahrt, Raumfahrt und Verkehr
HGF - Programm:Raumfahrt
HGF - Programmthema:Raumtransport
DLR - Schwerpunkt:Raumfahrt
DLR - Forschungsgebiet:R RP - Raumtransport
DLR - Teilgebiet (Projekt, Vorhaben):R - Systemanalyse Raumtransport (SART) [RP], D - ProTeKT
Standort: Bremen
Institute & Einrichtungen:Institut für Raumfahrtsysteme > Systemanalyse Raumtransport
Hinterlegt von: Wilken, Jascha
Hinterlegt am:29 Jul 2025 10:25
Letzte Änderung:29 Jul 2025 10:25

Nur für Mitarbeiter des Archivs: Kontrollseite des Eintrags

Blättern
Suchen
Hilfe & Kontakt
Informationen
OpenAIRE Validator logo electronic library verwendet EPrints 3.3.12
Gestaltung Webseite und Datenbank: Copyright © Deutsches Zentrum für Luft- und Raumfahrt (DLR). Alle Rechte vorbehalten.