Hainz, Svenja (2020) First SPD integrated assessment. Project Report.
|
PDF
1MB |
Abstract
The following deliverable shows the results for the Key Performance Indicators (KPIs) Life-Cycle Cost (LCC), Capacity and Reliability & Punctuality carried out with the reviewed quantitative KPI model fed by updated low-level KPIs of the Technical Demonstrators (TDs). It therefore documents the intermediate results of task 4.3 of IMPACT-2 and is a continuation of the deliverable D4.2 Initial estimation of the KPIs. This deliverable combined with the deliverable D4.3 Reviewed quantitative KPI model documents the progress since the first version of the quantitative KPI model developed within IMPACT-2 and displays the results of the reviewed System Platform Demonstrator (SPD) integrated assessment.
| Item URL in elib: | https://elib.dlr.de/142137/ | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Document Type: | Monograph (Project Report) | ||||||||
| Title: | First SPD integrated assessment | ||||||||
| Authors: |
| ||||||||
| Date: | 7 January 2020 | ||||||||
| Refereed publication: | Yes | ||||||||
| Open Access: | Yes | ||||||||
| Status: | Published | ||||||||
| Keywords: | KPI-Model, Life-Cycle Cos, Punctuality, Capacity, S2R, IMPACT-2 | ||||||||
| HGF - Research field: | Aeronautics, Space and Transport | ||||||||
| HGF - Program: | Transport | ||||||||
| HGF - Program Themes: | Rail Transport | ||||||||
| DLR - Research area: | Transport | ||||||||
| DLR - Program: | V SC Schienenverkehr | ||||||||
| DLR - Research theme (Project): | V - Digitalisierung und Automatisierung des Bahnsystems (old) | ||||||||
| Location: | Braunschweig | ||||||||
| Institutes and Institutions: | Institute of Transportation Systems > Design and Evaluation of Mobility Solutions, BS | ||||||||
| Deposited By: | Kurt, Filiz | ||||||||
| Deposited On: | 07 May 2021 14:58 | ||||||||
| Last Modified: | 20 Jun 2021 15:55 |
Repository Staff Only: item control page