Scheduling a manufacturing process with several rail-bound and identical machines in the project EWiMa

Schreiber, Markus (2017) Scheduling a manufacturing process with several rail-bound and identical machines in the project EWiMa. OR2017, 2017-09-06 - 2017-09-08, Berlin.

[img] MS PowerPoint
30MB

Kurzfassung

In the project EWiMa, efficient procedures for the manufacturing of wing covers are developed. One major objective is the manufacturing of such a component on GroFi. GroFi is a technology demonstrator for an innovative manufacturing plant that is specialized on the production of large-scale lightweight components. It is developed by the DLR in Stade (Germany). A special feature of the plant is the possibility to split steps of the production process between several identical production-units. The units are mobile on a rail network. It is expected that the production process is drastically shortened by synchronizing those steps. Among other problems the scheduling of the cooperating units is investigated by the DLR. In the project EWiMa, the usage of two synchronized fibre-placement units for the manufacturing process will be demonstrated for the first time. The schedules are calculated with a model that has been derived from the Quay Crane Scheduling Problem. The proposed presentation will describe the problems and conditions that have been considered for the scheduling. Furthermore the discrepancy between the modelled and the real execution times is examined to identify future improvements.

elib-URL des Eintrags:https://elib.dlr.de/116513/
Dokumentart:Konferenzbeitrag (Vortrag)
Titel:Scheduling a manufacturing process with several rail-bound and identical machines in the project EWiMa
Autoren:
AutorenInstitution oder E-Mail-AdresseAutoren-ORCID-iDORCID Put Code
Schreiber, Markusmarkus.schreiber (at) dlr.dehttps://orcid.org/0000-0003-1790-8923NICHT SPEZIFIZIERT
Datum:8 September 2017
Referierte Publikation:Nein
Open Access:Ja
Gold Open Access:Nein
In SCOPUS:Nein
In ISI Web of Science:Nein
Status:veröffentlicht
Stichwörter:Scheduling, Ablaufplanung, Fretigungsprozesse, QCSP, GroFi, EWiMa
Veranstaltungstitel:OR2017
Veranstaltungsort:Berlin
Veranstaltungsart:internationale Konferenz
Veranstaltungsbeginn:6 September 2017
Veranstaltungsende:8 September 2017
Veranstalter :GOR e.V.
HGF - Forschungsbereich:Luftfahrt, Raumfahrt und Verkehr
HGF - Programm:Luftfahrt
HGF - Programmthema:Flugzeuge
DLR - Schwerpunkt:Luftfahrt
DLR - Forschungsgebiet:L AR - Aircraft Research
DLR - Teilgebiet (Projekt, Vorhaben):L - Simulation und Validierung (alt)
Standort: Stade
Institute & Einrichtungen:Institut für Faserverbundleichtbau und Adaptronik > Verbundprozesstechnologien
Hinterlegt von: Schreiber, Markus
Hinterlegt am:19 Dez 2017 13:18
Letzte Änderung:24 Apr 2024 20:20

Nur für Mitarbeiter des Archivs: Kontrollseite des Eintrags

Blättern
Suchen
Hilfe & Kontakt
Informationen
electronic library verwendet EPrints 3.3.12
Gestaltung Webseite und Datenbank: Copyright © Deutsches Zentrum für Luft- und Raumfahrt (DLR). Alle Rechte vorbehalten.