The Integreted Fixed Interval Timetable: Optimazation with Genetic Algorithms and Fuzzy Tecniology.
Nachtigall, K. and Voget, S. (1995) The Integreted Fixed Interval Timetable: Optimazation with Genetic Algorithms and Fuzzy Tecniology. Symposium on Operations Research, Passau, 12.-15.09.1995.
Full text not available from this repository.
| Document Type: | Conference or Workshop Item (Speech) | ||||||
|---|---|---|---|---|---|---|---|
| Additional Information: | LIDO-Berichtsjahr=1995, | ||||||
| Title: | The Integreted Fixed Interval Timetable: Optimazation with Genetic Algorithms and Fuzzy Tecniology. | ||||||
| Authors: |
| ||||||
| Date: | 1995 | ||||||
| Status: | Published | ||||||
| Event Title: | Symposium on Operations Research, Passau, 12.-15.09.1995 | ||||||
| HGF - Research field: | UNSPECIFIED | ||||||
| HGF - Program: | no assignment | ||||||
| HGF - Program Themes: | no assignment | ||||||
| DLR - Research area: | UNSPECIFIED | ||||||
| DLR - Program: | no assignment | ||||||
| DLR - Research theme (Project): | ["eprint_fieldopt_dlr_project_search_L000" not defined] | ||||||
| Location: | Braunschweig | ||||||
| Institutes and Institutions: | Institute of Flight Control | ||||||
| Deposited By: | elib DLR-Beauftragter | ||||||
| Deposited On: | 02 Apr 2006 | ||||||
| Last Modified: | 27 Apr 2009 07:22 |
Repository Staff Only: item control page