elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Impressum | Datenschutz | Kontakt | English
Schriftgröße: [-] Text [+]

Crew time and workload in the EDEN ISS greenhouse in Antarctica

Zeidler, Conrad und Woeckner, Gerrit und Schöning, Johannes und Vrakking, Vincent und Zabel, Paul und Dorn, Markus und Schubert, Daniel und Steckelberg, Birgit und Stakemann, Josefine (2021) Crew time and workload in the EDEN ISS greenhouse in Antarctica. Life Sciences in Space Research. Elsevier. doi: 10.1016/j.lssr.2021.06.003. ISSN 2214-5524.

[img] PDF - Verlagsversion (veröffentlichte Fassung)
6MB

Kurzfassung

The goal of the EDEN ISS project is to research technologies for future greenhouses as a substantial part of planetary surface habitats. In this paper, we investigate crew time and workload needed to operate the space analogue EDEN ISS greenhouse on-site and remotely from the Mission Control Center. Within the almost three years of operation in Antarctica, different vegetable crops were cultivated, which yielded an edible biomass of 646 kg during the experiment phase 2018 and 2019. Operating in such a remote environment, analogue to future planetary missions, both greenhouse systems and remote support capabilities must be carefully developed and assessed to guarantee a reliable and efficient workflow. The investigation of crew time and workload is crucial to optimize processes within the operation of the greenhouse. For the Antarctic winter seasons, 2019 and 2020, as well as the summer season 2019/2020, the workload of the EDEN ISS greenhouse operators was assessed using the NASA Task Load Index. In addition, crew time was measured for the winter season 2019. The participants consisted of on-site operators, who worked inside the EDEN ISS greenhouse in Antarctica and the DLR remote support team, who worked in the Mission Control Center at the DLR Institute of Space Systems in Bremen (Germany). The crew time results show that crew time for the whole experiment phase 2019 required by the on-site operator team 2019 is approximately four times higher than the crew time of the corresponding remote support team without considering planning activities for the next mission. The total crew time for the experiment phase 2019 amounts to 694.5 CM-h or 6.31 CM-h/kg. With the measurements of the experiment phase 2019 it was possible to develop a methodology for crew time categorization for the remote support activities, which facilitates the analysis and increases the comparability of crew time values. In addition, the development of weekly and monthly crew time demand over the experiment phase is presented. The workload investigations indicate that the highest workload is perceived by the remote support team 2019 + 2020, followed by the summer maintenance team 2019/2020. The on-site operator team 2019 and on-site operator team 2020 showed the lowest values. The values presented in this paper indicate the need to minimize crew time as well as workload demands of the operators involved in the operation of future planetary surface greenhouses.

elib-URL des Eintrags:https://elib.dlr.de/143406/
Dokumentart:Zeitschriftenbeitrag
Titel:Crew time and workload in the EDEN ISS greenhouse in Antarctica
Autoren:
AutorenInstitution oder E-Mail-AdresseAutoren-ORCID-iDORCID Put Code
Zeidler, Conradconrad.zeidler (at) dlr.dehttps://orcid.org/0000-0001-6049-1321NICHT SPEZIFIZIERT
Woeckner, GerritNICHT SPEZIFIZIERTNICHT SPEZIFIZIERTNICHT SPEZIFIZIERT
Schöning, JohannesNICHT SPEZIFIZIERTNICHT SPEZIFIZIERTNICHT SPEZIFIZIERT
Vrakking, VincentVincent.Vrakking (at) dlr.dehttps://orcid.org/0000-0001-8633-2847NICHT SPEZIFIZIERT
Zabel, PaulPaul.Zabel (at) dlr.dehttps://orcid.org/0000-0001-7907-9230NICHT SPEZIFIZIERT
Dorn, Markusmarkus.dorn (at) dlr.deNICHT SPEZIFIZIERTNICHT SPEZIFIZIERT
Schubert, DanielDaniel.Schubert (at) dlr.dehttps://orcid.org/0000-0003-4969-486XNICHT SPEZIFIZIERT
Steckelberg, BirgitNICHT SPEZIFIZIERTNICHT SPEZIFIZIERTNICHT SPEZIFIZIERT
Stakemann, JosefineNICHT SPEZIFIZIERTNICHT SPEZIFIZIERTNICHT SPEZIFIZIERT
Datum:26 Juni 2021
Erschienen in:Life Sciences in Space Research
Referierte Publikation:Ja
Open Access:Ja
Gold Open Access:Nein
In SCOPUS:Ja
In ISI Web of Science:Ja
DOI:10.1016/j.lssr.2021.06.003
Verlag:Elsevier
ISSN:2214-5524
Status:veröffentlicht
Stichwörter:EDEN ISS Crew time Workload Remote support Operations Greenhouse Space analogue Life support system Antarctica Neumayer Station III
HGF - Forschungsbereich:Luftfahrt, Raumfahrt und Verkehr
HGF - Programm:Raumfahrt
HGF - Programmthema:Technik für Raumfahrtsysteme
DLR - Schwerpunkt:Raumfahrt
DLR - Forschungsgebiet:R SY - Technik für Raumfahrtsysteme
DLR - Teilgebiet (Projekt, Vorhaben):R - EDEN ISS Follow-on
Standort: Bremen
Institute & Einrichtungen:Institut für Raumfahrtsysteme > Systemanalyse Raumsegment
Hinterlegt von: Zeidler, Conrad
Hinterlegt am:03 Aug 2021 11:33
Letzte Änderung:22 Mai 2024 08:30

Nur für Mitarbeiter des Archivs: Kontrollseite des Eintrags

Blättern
Suchen
Hilfe & Kontakt
Informationen
electronic library verwendet EPrints 3.3.12
Gestaltung Webseite und Datenbank: Copyright © Deutsches Zentrum für Luft- und Raumfahrt (DLR). Alle Rechte vorbehalten.