elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Impressum | Datenschutz | Kontakt | English
Schriftgröße: [-] Text [+]

The EDEN ISS Antarctic Greenhouse Project: 9 Month Mission Status after Deployment in Antarctica

Schubert, Daniel (2018) The EDEN ISS Antarctic Greenhouse Project: 9 Month Mission Status after Deployment in Antarctica. KONTAKTSTUDIENTAGE 2018, 2018-11-09 - 2018-11-10, Hochschule Osnabrück. (nicht veröffentlicht)

Dieses Archiv kann nicht den Volltext zur Verfügung stellen.

Kurzfassung

Sustained human presence in space requires the development of new technologies to maintain environment control, to provide water, oxygen, food and to keep astronauts healthy and psychologically fit. The cultivation of higher plants can contribute to all major aspects within biological life support systems and represents an all-in-one-approach, not accomplished by any single physical/chemical system. The international EDEN ISS project aims to develop and validate technologies as well as investigate food safety and plant handling procedures for higher plant cultivation. A dedicated greenhouse module called the Mobile Test Facility was built by an international consortium within the European Horizon 2020 framework. The EDEN ISS consortium focused on advancing controlled environment agriculture technologies and adjoining research fields for safe food production in closed-loop space systems such as planetary habitats and transfer vehicles. A key element of the project is the testing of the greenhouse system during an analogue mission at the Neumayer Station III in Antarctica. In addition to advancing hardware for space flight, the facility provides the overwintering Neumayer Station III crew of 10 people with fresh vegetables. The paper presents the current mission status (after 9 months) of the EDEN ISS mission. An overview of the as-built design configuration of the Mobile Test Facility is described. A detailed overview of the assembly integration and test phase is given that took place at the DLR Institute of Space Systems during 2017. Further, the main phases of the December 2017 to February 2018 deployment mission in Antarctica are presented. First observations of the ramp up phase are given and first scientific outcomes are also presented.

elib-URL des Eintrags:https://elib.dlr.de/132058/
Dokumentart:Konferenzbeitrag (Vortrag)
Titel:The EDEN ISS Antarctic Greenhouse Project: 9 Month Mission Status after Deployment in Antarctica
Autoren:
AutorenInstitution oder E-Mail-AdresseAutoren-ORCID-iDORCID Put Code
Schubert, DanielDaniel.Schubert (at) dlr.dehttps://orcid.org/0000-0003-4969-486XNICHT SPEZIFIZIERT
Datum:2018
Referierte Publikation:Nein
Open Access:Nein
Gold Open Access:Nein
In SCOPUS:Nein
In ISI Web of Science:Nein
Status:nicht veröffentlicht
Stichwörter:EDEN ISS, Plant cultivation, Antarctica, Analogue testing, human spaceflight
Veranstaltungstitel:KONTAKTSTUDIENTAGE 2018
Veranstaltungsort:Hochschule Osnabrück
Veranstaltungsart:Andere
Veranstaltungsbeginn:9 November 2018
Veranstaltungsende:10 November 2018
Veranstalter :Hochschule Osnabrück
HGF - Forschungsbereich:Luftfahrt, Raumfahrt und Verkehr
HGF - Programm:Raumfahrt
HGF - Programmthema:Technik für Raumfahrtsysteme
DLR - Schwerpunkt:Raumfahrt
DLR - Forschungsgebiet:R SY - Technik für Raumfahrtsysteme
DLR - Teilgebiet (Projekt, Vorhaben):R - Systemanalyse Raumsegment (alt)
Standort: Bremen
Institute & Einrichtungen:Institut für Raumfahrtsysteme > Systemanalyse Raumsegment
Hinterlegt von: Schubert, Daniel
Hinterlegt am:04 Dez 2019 10:50
Letzte Änderung:24 Apr 2024 20:35

Nur für Mitarbeiter des Archivs: Kontrollseite des Eintrags

Blättern
Suchen
Hilfe & Kontakt
Informationen
electronic library verwendet EPrints 3.3.12
Gestaltung Webseite und Datenbank: Copyright © Deutsches Zentrum für Luft- und Raumfahrt (DLR). Alle Rechte vorbehalten.