elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Imprint | Contact | Deutsch
Fontsize: [-] Text [+]

TanDEM-X Commissioning Phase Status

Hueso Gonzalez, Jaime and Bachmann, Markus and Hofmann, Harald (2010) TanDEM-X Commissioning Phase Status. In: Proceedings of IEEE Geoscience and Remote Sensing Symposium (IGARSS), pp. 1-4. IEEE. IEEE Geoscience and Remote Sensing Symposium (IGARSS), 2010-07-26 - 2010-07-30, Honolulu, Hawaii, USA.

[img] PDF (Paper) - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
493kB
[img] PDF (Presentation) - Requires a PDF viewer such as GSview, Xpdf or Adobe Acrobat Reader
7MB

Abstract

TanDEM-X is an Earth Observation mission, result of the cooperation of the German Aerospace Center (DLR) and EADS Astrium GmbH, consisting of two twin synthetic aperture radar (SAR) satellites, TerraSAR-X (TSX) and TanDEM-X (TDX). TSX has been operative since 2007, and TDX has been launched on the first half of 2010. Both satellites fly in a versatile, configurable and closely controlled helix orbit formation in order to acquire single-pass cross-track interferometric SAR (InSAR) images of the Earth with the optimal performance. The goal is to generate a global highly accurate digital elevation model (DEM) with 12 m resolution, 10 m absolute- and 2 m relative-height accuracy. This has to be achieved over the whole Earth’s land surface within 4 years after launch. In order to assure the accurate completion of this DEM product, TDX has to undertake a precise commissioning phase in a tight time schedule. The commissioning phase activities range from the monostatic calibration (analogue to the one performed for TSX) to the commissioning of bistatic aspects like the innovative flight formation, the collision avoidance strategy, the upgraded mission planning and ground station network, the synchronization performance, the baseline calibration and the illumination risk handling. The paper describes the status of this challenging commissioning phase and a detailed description of the main phases and activities.

Document Type:Conference or Workshop Item (Speech)
Additional Information:©2010 IEEE. Personal use of this material is permitted. However, permission to reprint/republish this material for advertising or promotional purposes or for creating new collective works for resale or redistribution to servers or lists, or to reuse any copyrighted component of this work in other works must be obtained from the IEEE.
Title:TanDEM-X Commissioning Phase Status
Authors:
AuthorsInstitution or Email of Authors
Hueso Gonzalez, JaimeUNSPECIFIED
Bachmann, MarkusUNSPECIFIED
Hofmann, HaraldUNSPECIFIED
Date:29 July 2010
Journal or Publication Title:Proceedings of IEEE Geoscience and Remote Sensing Symposium (IGARSS)
Refereed publication:Yes
In ISI Web of Science:No
Page Range:pp. 1-4
Publisher:IEEE
Status:Published
Keywords:TanDEM-X, Commissioning Phase, Monostatic, Bistatic, Collision Avoidance, Illumination Avoidance, Synchronization
Event Title:IEEE Geoscience and Remote Sensing Symposium (IGARSS)
Event Location:Honolulu, Hawaii, USA
Event Type:international Conference
Event Dates:2010-07-26 - 2010-07-30
Organizer:IEEE
HGF - Research field:Aeronautics, Space and Transport (old)
HGF - Program:Space (old)
HGF - Program Themes:W EO - Erdbeobachtung
DLR - Research area:Space
DLR - Program:W EO - Erdbeobachtung
DLR - Research theme (Project):W - Projekt TanDEM-X (old)
Location: Oberpfaffenhofen
Institutes and Institutions:Microwaves and Radar Institute > Spaceborne SAR Systems
Space Operations and Astronaut Training > GSOC-German Space Operations Center
Deposited By: Jaime Hueso Gonzalez
Deposited On:28 Dec 2009 16:51
Last Modified:21 Mar 2014 10:45

Repository Staff Only: item control page

Browse
Search
Help & Contact
Informationen
electronic library is running on EPrints 3.3.12
Copyright © 2008-2012 German Aerospace Center (DLR). All rights reserved.