elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Imprint | Contact | Deutsch
Fontsize: [-] Text [+]

Nominal Request To Command Converter Tool Verification and Validation Plan

Grigorov, Christo and Bueso Bello, Jose Luis (2011) Nominal Request To Command Converter Tool Verification and Validation Plan. Project Report. PZ-DLR-UM-5110, 24 S.

Full text not available from this repository.

Abstract

This document describes the test procedure for verification and validation testing of the Nominal Request To Command Converter Tool (R2CC).

Document Type:Monograph (Project Report)
Title:Nominal Request To Command Converter Tool Verification and Validation Plan
Authors:
AuthorsInstitution or Email of Authors
Grigorov, ChristoUNSPECIFIED
Bueso Bello, Jose LuisUNSPECIFIED
Date:September 2011
Number of Pages:24
Status:Published
Keywords:Nominal Request To Command Converter (R2CC) Verification and Validation Plan
HGF - Research field:Aeronautics, Space and Transport (old)
HGF - Program:Space (old)
HGF - Program Themes:W - no assignement
DLR - Research area:Space
DLR - Program:W - no assignement
DLR - Research theme (Project):W -- no assignement (old)
Location: Oberpfaffenhofen
Institutes and Institutions:Microwaves and Radar Institute
Microwaves and Radar Institute > Spaceborne SAR Systems
Deposited By: Christo Grigorov
Deposited On:13 Dec 2011 13:05
Last Modified:13 Dec 2011 13:05

Repository Staff Only: item control page

Browse
Search
Help & Contact
Informationen
electronic library is running on EPrints 3.3.12
Copyright © 2008-2012 German Aerospace Center (DLR). All rights reserved.