GMES Sentinel-1 Calibration and Performance Budget
Döring, Björn and Zink, Manfred and Schwerdt, Marco (2008) GMES Sentinel-1 Calibration and Performance Budget. Project Report. S1-TN-DLR-SY-0003, Issue 1.1, 18 S.
![]() | There is a more recent version of this item available. |
Full text not available from this repository.
Abstract
This document aims to derive the absolute radiometric accuracy for the Sentinel 1 SAR satellite. It integrates results found by EADS Astrium regarding the SAR instrument and processing, and derives additional uncertainty contributions with respect to the external calibration and the atmosphere.
| Document Type: | Monograph (Project Report) | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Title: | GMES Sentinel-1 Calibration and Performance Budget | ||||||||
| Authors: |
| ||||||||
| Date: | July 2008 | ||||||||
| Refereed publication: | No | ||||||||
| In SCOPUS: | No | ||||||||
| In ISI Web of Science: | No | ||||||||
| Number of Pages: | 18 | ||||||||
| Series Name: | Technical Note | ||||||||
| Status: | Published | ||||||||
| Keywords: | radiometric calibration, SAR system, Sentinel-1 | ||||||||
| HGF - Research field: | Aeronautics, Space and Transport | ||||||||
| HGF - Program: | Space | ||||||||
| HGF - Program Themes: | W EO - Erdbeobachtung | ||||||||
| DLR - Research area: | Space | ||||||||
| DLR - Program: | W EO - Erdbeobachtung | ||||||||
| DLR - Research theme (Project): | other | ||||||||
| Location: | Oberpfaffenhofen | ||||||||
| Institutes and Institutions: | Microwaves and Radar Institute Microwaves and Radar Institute > Spaceborne SAR Systems | ||||||||
| Deposited By: | Björn Döring | ||||||||
| Deposited On: | 15 Dec 2008 | ||||||||
| Last Modified: | 18 Jan 2010 13:52 |
Available Versions of this Item
- GMES Sentinel-1 Calibration and Performance Budget. (deposited 15 Dec 2008) [Currently Displayed]
Repository Staff Only: item control page
