elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Imprint | Contact | Deutsch
Fontsize: [-] Text [+]

GOME data processor configuration during commissioning phase In: GOME Geophy sical validation campaign

Balzer, Wolfgang and Loyola, Diego and Aberle, Bernd and Mikusch, Eberhard and Ruppert, Thomas and Schmid, Cornelia and Spurr, Robert and Thomas, Werner and Wolfmüller, Meinhard (1996) GOME data processor configuration during commissioning phase In: GOME Geophy sical validation campaign. In: ESA, pp. 33-38.

Full text not available from this repository.


Document Type:Conference or Workshop Item (Paper)
Additional Information: institution=ESA, LIDO-Berichtsjahr=1996,
Title:GOME data processor configuration during commissioning phase In: GOME Geophy sical validation campaign
Authors:
AuthorsInstitution or Email of Authors
Balzer, WolfgangUNSPECIFIED
Loyola, DiegoUNSPECIFIED
Aberle, BerndUNSPECIFIED
Mikusch, EberhardUNSPECIFIED
Ruppert, ThomasUNSPECIFIED
Schmid, CorneliaUNSPECIFIED
Spurr, RobertUNSPECIFIED
Thomas, WernerUNSPECIFIED
Wolfmüller, MeinhardUNSPECIFIED
Date:1996
Journal or Publication Title:ESA
Page Range:pp. 33-38
Series Name:WPP-108
Status:Published
HGF - Research field:UNSPECIFIED
HGF - Program:other
HGF - Program Themes:other
DLR - Research area:UNSPECIFIED
DLR - Program:no assignment
DLR - Research theme (Project):UNSPECIFIED
Location: other
Institutes and Institutions:German Remote Sensing Data Center > Hauptabteilung Angewandte Datentechnik
Deposited By: elib DLR-Beauftragter
Deposited On:10 Apr 2006
Last Modified:27 Apr 2009 05:15

Repository Staff Only: item control page

Browse
Search
Help & Contact
Informationen
electronic library is running on EPrints 3.3.12
Copyright © 2008-2012 German Aerospace Center (DLR). All rights reserved.