elib
DLR-Header
DLR-Logo -> http://www.dlr.de
DLR Portal Home | Imprint | Contact | Deutsch
Fontsize: [-] Text [+]

Estimation of vertical TEC by using PRARE/Meteor 3 X/S band group delay measurements at the PRARE groundstation Neustrelitz - preliminary results.

Jakowski, N. and Pannowitsch, H.-J. and Reimer, R. and Schwarz, A. (1994) Estimation of vertical TEC by using PRARE/Meteor 3 X/S band group delay measurements at the PRARE groundstation Neustrelitz - preliminary results. ERS-2 PRARE User Workshop, GFZ Potsdam, 8.-9.11.1994.

Full text not available from this repository.


Document Type:Conference or Workshop Item (Speech)
Additional Information: LIDO-Berichtsjahr=1994, note=RIM,
Title:Estimation of vertical TEC by using PRARE/Meteor 3 X/S band group delay measurements at the PRARE groundstation Neustrelitz - preliminary results.
Authors:
AuthorsInstitution or Email of Authors
Jakowski, N.UNSPECIFIED
Pannowitsch, H.-J.UNSPECIFIED
Reimer, R.UNSPECIFIED
Schwarz, A.UNSPECIFIED
Date:1994
Status:Published
Event Title:ERS-2 PRARE User Workshop, GFZ Potsdam, 8.-9.11.1994
HGF - Research field:UNSPECIFIED
HGF - Program:other
HGF - Program Themes:other
DLR - Research area:UNSPECIFIED
DLR - Program:no assignment
DLR - Research theme (Project):UNSPECIFIED
Location: other
Institutes and Institutions:German Remote Sensing Data Center > Hauptabteilung Angewandte Datentechnik
Deposited By: elib DLR-Beauftragter
Deposited On:02 Apr 2006
Last Modified:27 Apr 2009 05:13

Repository Staff Only: item control page

Browse
Search
Help & Contact
Informationen
electronic library is running on EPrints 3.3.12
Copyright © 2008-2012 German Aerospace Center (DLR). All rights reserved.